Press center menu
VNIPIpromtechnologii Performed Design Works for ALROSA’s Yakutnipromalmaz Institute

The Engineering Center made hydrogeological and hydrodynamic models, calculations of measures for drainage of mine workings and groundwater disposal at the Aikhal, International and Udachny diamond mines. These works are necessary for analysis of the course of mining operations in mines, predicting and protecting against flooding, and determining the rock massif stability in permafrost conditions. Also, at the International mine, design documentation was developed for the filling mixture well transportation to the 790 m horizon. «Hydrogeological and hydrodynamic models developed by us have already proven their viability for half a century at the uranium mines of the Priargunskoye Mining and Chemical Union and at the other mining enterprises. We design developments for permafrost conditions, particularly, for Khiagda, JSC. The experience of working at the nuclear industry mining enterprises imposes the highest responsibility on us: we have no right to make mistakes, we have no right not to make the project qualitatively or not deliver it on time,» says Alexey Shemetov, Director General, VNIPIpromtechnologii, JSC.
The Engineering Center plans to continue work on orders from AK ALROSA, PJSC. «Our experts are ready to contribute to ensuring the safety of mining operations in diamond mines,» said Alexey Shemetov confidently.